Read More

Past Issues (PDF)

Tools

Links

Latest Comments

Site search

Stay Connected



Special Feature

Recently Added

Articles by Date

SunMonTueWedThuFriSat
1234567
891011121314
15161718192021
22232425262728
293031    
       
     12
3456789
10111213141516
17181920212223
24252627282930
       
  12345
6789101112
13141516171819
20212223242526
2728293031  
       
      1
2345678
9101112131415
16171819202122
23242526272829
3031     
    123
45678910
11121314151617
18192021222324
252627282930 
       
 123456
78910111213
14151617181920
21222324252627
28293031   
       
      1
2345678
9101112131415
16171819202122
23242526272829
30      
   1234
567891011
12131415161718
19202122232425
262728293031 
       
   1234
567891011
12131415161718
19202122232425
262728    
       
1234567
891011121314
15161718192021
22232425262728
293031    
       
    123
45678910
11121314151617
18192021222324
25262728293031
       
  12345
6789101112
13141516171819
20212223242526
27282930   
       
      1
2345678
9101112131415
16171819202122
23242526272829
3031     
    123
45678910
11121314151617
18192021222324
252627282930 
       
 123456
78910111213
14151617181920
21222324252627
28293031   
       
     12
3456789
10111213141516
17181920212223
24252627282930
31      
   1234
567891011
12131415161718
19202122232425
2627282930  
       
1234567
891011121314
15161718192021
22232425262728
293031    
       
     12
3456789
10111213141516
17181920212223
24252627282930
       
  12345
6789101112
13141516171819
20212223242526
2728293031  
       
 123456
78910111213
14151617181920
21222324252627
2829     
       
     12
3456789
10111213141516
17181920212223
24252627282930
31      
  12345
6789101112
13141516171819
20212223242526
2728293031  
       
1234567
891011121314
15161718192021
22232425262728
2930     
       
    123
45678910
11121314151617
18192021222324
25262728293031
       
  12345
6789101112
13141516171819
20212223242526
27282930   
       
      1
2345678
9101112131415
16171819202122
23242526272829
3031     
   1234
567891011
12131415161718
19202122232425
262728293031 
       
 123456
78910111213
14151617181920
21222324252627
282930    
       
     12
3456789
10111213141516
17181920212223
24252627282930
31      
   1234
567891011
12131415161718
19202122232425
2627282930  
       
1234567
891011121314
15161718192021
22232425262728
293031    
       
1234567
891011121314
15161718192021
22232425262728
       
       
    123
45678910
11121314151617
18192021222324
25262728293031
       
 123456
78910111213
14151617181920
21222324252627
28293031   
       
      1
2345678
9101112131415
16171819202122
23242526272829
30      
   1234
567891011
12131415161718
19202122232425
262728293031 
       
 123456
78910111213
14151617181920
21222324252627
282930    
       
     12
3456789
10111213141516
17181920212223
24252627282930
31      
  12345
6789101112
13141516171819
20212223242526
2728293031  
       
1234567
891011121314
15161718192021
22232425262728
2930     
       
    123
45678910
11121314151617
18192021222324
25262728293031
       
  12345
6789101112
13141516171819
20212223242526
27282930   
       
      1
2345678
9101112131415
16171819202122
23242526272829
3031     
      1
2345678
9101112131415
16171819202122
232425262728 
       
   1234
567891011
12131415161718
19202122232425
262728293031 
       
1234567
891011121314
15161718192021
22232425262728
293031    
       
     12
3456789
10111213141516
17181920212223
24252627282930
       

EPA ORDERS REMOVAL OF WASTE PITS

WASHINGTON, DC – Executive Director Scott Pruitt today announced the final decision on the disposition of the toxic waste dumps in the San Jacinto River, near the I-10 bridge.

In a press release dated Wednesday, Oct. 11 the EPA said they had issued a final “Record of Decision” based on the best interests of nearby residents, local businesses, and downstream resources including the Galveston Bay estuary. The plan for complete removal of the waste material has been modified to provide cofferdams around the excavation of dry material, instead of wet material in the original plan.

The cost is now estimated at $115 million instead of the previous $97 million.The proposal includes both the Northern and the Southern impoundment areas. 212,000 cubic yards of dioxin contaminated material will be removed from the sites for proper disposal.

Local environmentalists and officials praised the decision of the EPA, including Jackie Young of THEA and the San Jacinto River Coalition. Young has led the fight for removal of the pits for a number of years, prompted by serious health problems she attributes to pollution from the waste pits.

Others who issued statements in favor of the decision included Harris County Attorneys Vince Ryan and Terry O’Rourke, Congreeman Gene Green, and Precinct 2 Commissioner Jack Morman.

Jackie Young told the Star that she was pleased with the decision, but would continue to be engaged in the issue, and be a “watchdog” over the removal project.

One opponent to the decision, the “KeepItCapped” group, issued the following statement:

Statement From McGinnes Industrial Maintenance Corp. (MIMC) Regarding the U.S. EPA’s Record of Decision

“We cannot support a plan for the site that provides less protection to all affected communities than the existing cap already has provided. We are deeply concerned that the decision announced today could result in a release to the San Jacinto River and downstream areas. We disagree with EPA’s claim that the local or downstream areas can be protected during removal. We will review U.S. EPA’s Record of Decision in its entirety.”

Here is the full text of the EPA press release, and the Final RECORD OF DECISION:

DALLAS – (Oct. 11, 2017) The cleanup plan to address highly toxic dioxin contamination at the San Jacinto Waste Pits Superfund site in Harris County, Texas has been approved. The selected remedy will protect human health and the environment by removing highly contaminated material from the site and securing less contaminated areas. The plan provides certainty to people living near the site by permanently addressing risk posed by the contamination. It also provides certainty to other economic interests including the businesses that rely on the San Jacinto River for navigation and the Interstate-10 transportation corridor.

“Today, we are announcing our decision to ensure the San Jacinto site is cleaned up for the benefit of the entire community,” said EPA Administrator Scott Pruitt. “As exemplified today, EPA is prioritizing Superfund clean-up by making decisions in a decisive, timely manner. The San Jacinto Waste Pits site was added to the  National Priority List nearly a decade ago, and I am pleased to announce a decision has been made to permanently address the highly toxic materials to ensure health and safety in the surrounding communities.”

EPA’s cleanup plan includes installing engineering controls such as cofferdams before excavating almost 212,000 cubic yards of dioxin contaminated material for disposal. A small amount of material will stay on the site where controls will prevent access, eliminate off-site migration and monitor the natural recovery into the future. The estimated cost for the remedy is $115 million and is cost-effective; representing a reasonable value for the cost incurred.

EPA’s final cleanup plan, called a Record of Decision, addresses comments on the proposed plan concerning the risk of water spreading dioxin contamination downstream by installing controls such as cofferdams to allow for dry excavation of the waste material. Changes in the construction method will effectively eliminate any potential for spreading contamination to downstream areas. The $97 million proposed plan outlined wet excavation of material.

The Superfund site consists of two sets of impoundments, or pits, built in the mid-1960s for disposing solid and liquid pulp and paper mill wastes that are contaminated with polychlorinated dibenzopdioxins (dioxins) and polychlorinated dibenzofurans (furans). In 2011, the impoundments were covered with an armored cap as a temporary way to contain the contaminants.

EPA’s decision, fully explained in the Record of Decision, is based on extensive studies of the contamination, human health risks, and environmental risks of this site. The final cleanup plan considers the ever-changing San Jacinto River, which encroaches on the site, and protecting important downstream resources including the Galveston Bay estuary.

EPA’s selected remedy will permanently address the highly toxic dioxin waste materials, meets the federal regulatory requirements of the National Contingency Plan for cleanup of hazardous sites, and is protective of public health and the environment. EPA will release an Administrative Record, which consists of all documents used to support its selected remedy.

EPA added the San Jacinto Waste Pits site to the National Priorities List of Superfund sites in 2008, after testing revealed contamination from dioxins and furans near the waste pits. The northern set of impoundments, about 14 acres in size, is located on the western bank of the San Jacinto River, north of the Interstate-10 bridge over the San Jacinto River. These northern impoundments are partially submerged in the river. The southern impoundment, less than 20 acres in size, is located on a small peninsula that extends south of the Interstate-10 bridge. EPA is the lead agency for addressing the site and cleaning up the contamination, with support from several state partners and the U.S. Army Corps of Engineers.

The Administrative Record, including the Record of Decision, for the San Jacinto River Waste Pits Superfund Site is available online at: https://www.epa.gov/tx/sjrwp and at the following locations:

Stratford Branch Library

509 Stratford Street

Highlands, Texas   77562

Leave a Comment: